The airport runway work includes resurfacing the current runway, repositioning it 120m to the west and creating longer safety areas at both ends.

The areas next to the terminal where aircraft park will also be replaced and a completely new drainage system installed.

The taxiways, which link the aprons and runway, will be resurfaced and realigned, along with new ground lighting and navigational aids and the approach lights to the east and west of the airport will also move.

The Environment Department conditions included no changes being made to the plans without permission, that the work begins within three years, the approval of a traffic management plan, and a construction environmental management plan being agreed for each of the processing sites.

The return of the land to its previous state, minimising the visual impact of the development and the environmental impact of the work are the main focus of a number of the conditions.

The department also ruled it would allow no changes be made to the St Sampson's breakwater, which was built in the 19th Century, without its prior permission.

party shops london
best hgh

Mr007

Posts : 267
Join date : 2011-03-01

Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum